dop_ddom_mm5_2_ct_alrt: Alert files of the MM5 CONTROL forecast for the CDOM domain.

Bauer, Hans-Stefan et al.

Dataset
Summary
The file contains the alters for the major river catchments in the D-PHASE domain. Beware: Our model only produces output in the COPS region. Therefore, only the catchments of this region contain non-missing values..
Note: In the dphase_mm5_2_4d and dphase_mm5_2_ct experiments the datasets are called CDOM and DDOM, but both cover only the CDOM region. They differ only in time resolution (DDOM 1h, CDOM 15min) not in region.
Project
DPHASE (D-PHASE, Demonstration of Probabilistic Hydrological and Atmospheric Simulation of flood Events in the Alpine region)
Location(s)
COPS region (CDOM)
Additional Information
dop_mm5_2_ct_add_info_1: pdf-file with model performance info
uni_hohenheim_data_policy.txt
dphase_implementation_plan_info: pdf-file with subsection (ip-3.1.3.) of MAP D-PHASE implementation plan
Spatial Coverage
Longitude 6 to 11 Latitude 47 to 50 Altitude: 0 m relativ to NN
Temporal Coverage
2007-06-01 to 2007-11-30 (calendrical)
Use constraints
For scientific use only. No commercial use allowed. Please be aware of the common COPS/GOP/D-PHASE data policy (http://cops.wdc-climate.de/)
Data Catalog
World Data Center for Climate
Access constraints
registered users
Size
4.95 MiB (5194492 Byte)
Format
XML
Status
completely archived
Creation Date
Download Permission
Please login to check permission and download options
Cite as
[ Derived from parent entry - See data hierarchy tab ]
Bauer, Hans-Stefan; Grzeschik, Matthias; Zus, Florian; Schwitalla, Thomas; Wulfmeyer, Volker (2009). dphase_mm5_2_ct: MM5 model forecast with 2 km horizontal resolution driven by ECMWF operational forecast run by UHOH for the MAP D-PHASE project. World Data Center for Climate (WDCC) at DKRZ. https://doi.org/10.1594/WDCC/dphase_mm5_2_ct

BibTeX RIS
Description
One file is provided each day during the experiment
The data files for 04/07/07, 18/07/07, 02/08/07 and 28/08/07 contain only dummy files.
Description
Due to a technical problem in the alert generation, empty alerts files have been produced from 1. until at least 3. Oct. 2007. Depending on how fast this problem has been fixed for each participating D-PHASE model, the interupt may last a few days longer.
VariableUnit
multiple variables
various
Contact typePersonORCIDOrganization
-
-
-

Parent

dphase_mm5_2_ct: MM5 model forecast with 2 km horizontal resolution driven by ECMWF operational forecast run by UHOH for the MAP D-PHASE project
Details
[Entry acronym: dop_ddom_mm5_2_ct_alrt] [Entry id: 2151396]