dphase_mm5_2_ct: MM5 model forecast with 2 km horizontal resolution driven by ECMWF operational forecast run by UHOH for the MAP D-PHASE project

doi:10.1594/WDCC/dphase_mm5_2_ct

Bauer, Hans-Stefan et al.

ExperimentDOI
Summary
Accurate initialization of the water vapor field is important for NWP. With recent advances in Global Positioning System (GPS) atmospheric remote sensing, ground-based GPS receivers have become an important instrument that can provide high resolution water vapor measurements operationally at low cost with an accuracy of a few millimeters. The system can operate in all weather conditions.
During the COPS campaign, a dense network of GPS receivers was installed. This data has been assimilated in real-time into the MM5 4DVAR system to improve quantitative precipitation forecasts and process understanding. Operational forecasts initialized with 4DVAR and corresponding CONTROL forecasts, initialized only by the ECMWF forecast,ran the whole COPS/D-PHASE period to provide a basis for future statistical investigations.
This experiment contains only the innermost domain (2km) of the forecast initialized with the operational ECMWF forecast only (CONTROL). The corresponding 4DVAR forecast can be found as experiment dphase_mm5_2_4d.
Assimilation run:
- 18 km horizontal resolution
- 36 level up tp 100 hPa
- 64x70 grid points
- MM5 3.4 (4DVAR version)
- Kuo convection scheme
- MRF PBL scheme
- Simple radiation
- Warm cloud microphysics
- 3 hour assimilation window
Free forecast run: only innermost 2km domain (CDOM) was archived)
- Triple 2-way nested 24h forecast (18, 6, 2 km resolution)
- 36 level up to 100 hPa
- 64x70 points (18 km), 106x109 points (6 km), 169x184 points (2 km)
- MM5 3.7.4
- Kain Fritsch 2 cumulus (no parameterization in the 2 km domain)
- Reisner2 cloud microphysics
- RRTM LW + Dudhia SW radiation
- MRF PBL scheme
- 5 layer soil model
Note: here the datasets differ in time resolution (DDOM:1h, CDOM 15min) not in region.
Grid description:"CDOM"+"DDOM":xinc/yinc:2.0 xnpole/ynpole:0.0
xfirst:6.0205 yfirst:47.0167 xsize:184.0 ysize:169.0
Project
DPHASE (D-PHASE, Demonstration of Probabilistic Hydrological and Atmospheric Simulation of flood Events in the Alpine region)
Contact
Hans-Stefan Bauer (
 hsbauer@nulluni-hohenheim.de
)
Location(s)
D-PHASE region (DDOM)
Spatial Coverage
Longitude 2 to 18 Latitude 43 to 50 Altitude: 0 m relativ to NN
Temporal Coverage
2007-06-01 to 2007-11-30 (calendrical)
Use constraints
For scientific use only. No commercial use allowed. Please be aware of the common COPS/GOP/D-PHASE data policy (http://cops.wdc-climate.de/)
Data Catalog
World Data Center for Climate
Size
597.90 GiB (641986692412 Byte)
Format
GRIB1; records separated, XML, tar of jpg
Status
completely archived
Creation Date
Cite as
Bauer, Hans-Stefan; Grzeschik, Matthias; Zus, Florian; Schwitalla, Thomas; Wulfmeyer, Volker (2009). dphase_mm5_2_ct: MM5 model forecast with 2 km horizontal resolution driven by ECMWF operational forecast run by UHOH for the MAP D-PHASE project. World Data Center for Climate (WDCC) at DKRZ. https://doi.org/10.1594/WDCC/dphase_mm5_2_ct

BibTeX RIS
Description
One 24h forecast initialized at 00Z is provided each day.
According to agreements within DPHASE data from timesteps not delivered in time could be missing. In this case a dummy file was created and inserted in the database.
Description
During the first two weeks tuning work is done. Afterwards, we freeze the system to create a consistent data set usable for statistcal investigations.
Description
Summary:
Findable: 6 of 7 level;
Accessible: 2 of 3 level;
Interoperable: 3 of 4 level;
Reusable: 4 of 10 level
Method
F-UJI online v2.2.1 automated
Method Description
Checks performed by WDCC. Metrics documentation: https://doi.org/10.5281/zenodo.4081213 Metric Version: metrics_v0.5
Method Url
Result Date
2022-12-09
Description
Quality control:
- control of 'CERA UI Compact' metadata by author
- control of file transfer with check sum
- check of start and end date with qual.sh (APR 2009)
- check of number of data points with qual.sh (APR 2009)
- check continous time with cera_check.check_continuous_time.CHECK_EXPERIMENT (APR 2009)
Method
QA checklist manual
Method Description
Checks performed by WDCC and author.
Contact typePersonORCIDOrganization
-
-
-
-
-
-
-
-

Attached Datasets ( 17 )

Details for selected entry

Additional Info

Details for selected entry
[Entry acronym: dphase_mm5_2_ct] [Entry id: 2151361]