dphase_mm5_60: MM5 model 72h forecast (60km) run by FZK-IMK for the MAP D-PHASE project

doi:10.1594/WDCC/dphase_mm5_60

Werhahn, Johannes

ExperimentDOI
Summary
72h forecast with MM5 V3.7 using
- 60km x 60km resolution
- 55 x 45 Grids
- NOAA GFS input
- Noah land-surface scheme
- MRF PBL
- Grell cumulus scheme
- Graupel (Reisner2) explicit moisture scheme
- Cloud for atmospheric radiation

Grid description:
DDOM: xfirst: -6.769222 yfirst: 34.404968 xsize: 55.0 ysize: 45.0 xinc: 0.2 yinc: 0.54 xnpole: 0.0 ynpole: 0.0
Project
DPHASE (D-PHASE, Demonstration of Probabilistic Hydrological and Atmospheric Simulation of flood Events in the Alpine region)
Contact
Johannes Werhahn (
 johannes.werhahn@nullimk.fzk.de
)
Location(s)
D-PHASE region (DDOM)
Spatial Coverage
Longitude 2 to 18 Latitude 43 to 50 Altitude: 0 m relativ to NN
Temporal Coverage
2007-06-01 to 2007-11-30 (calendrical)
Use constraints
For scientific use only. No commercial use allowed. Please be aware of the common COPS/GOP/D-PHASE data policy (http://cops.wdc-climate.de/)
Data Catalog
World Data Center for Climate
Size
30.42 GiB (32663191625 Byte)
Format
GRIB1; records separated, XML, tar file, zipped
Status
completely archived
Creation Date
Cite as
Werhahn, Johannes (2009). dphase_mm5_60: MM5 model 72h forecast (60km) run by FZK-IMK for the MAP D-PHASE project. World Data Center for Climate (WDCC) at DKRZ. https://doi.org/10.1594/WDCC/dphase_mm5_60

BibTeX RIS
Description
According to agreements within DPHASE data from timesteps not delivered in time could be missing. In this case a dummy file was created and inserted in the database.
Description
Summary:
Findable: 6 of 7 level;
Accessible: 2 of 3 level;
Interoperable: 3 of 4 level;
Reusable: 4 of 10 level
Method
F-UJI online v2.2.1 automated
Method Description
Checks performed by WDCC. Metrics documentation: https://doi.org/10.5281/zenodo.4081213 Metric Version: metrics_v0.5
Method Url
Result Date
2022-12-09
Description
Quality control:
- control of 'CERA UI Compact' metadata by author
- control of file transfer with check sum
- check of start and end date with qual.sh (APR 2009)
- check of number of data points with qual.sh (APR 2009)
- check continous time with cera_check.check_continuous_time.CHECK_EXPERIMENT (APR 2009)
Method
QA checklist manual
Method Description
Checks performed by WDCC and author.
Contact typePersonORCIDOrganization
-
-
-
-

Attached Datasets ( 6 )

Details for selected entry

Additional Info

Details for selected entry
[Entry acronym: dphase_mm5_60] [Entry id: 2151363]