RCM forcing data from three realisations of the CMIP5 future scenario experiment rcp26. The experiment covers the period 2006-2100. The members are started end of 2005 from the respective members of the historical experiment.
SQA - Scientific Quality Assurance 'approved by author'
Result Date
2012-10-10
Technical Quality Assurance (TQA)
TQA - Technical Quality Assurance 'approved by WDCC'
Description
1. Number of data sets is correct and > 0: passed; 2. Size of every data set is > 0: passed; 3. The data sets and corresponding metadata are accessible: passed; 4. The data sizes are controlled and correct: passed; 5. The temporal coverage description (metadata) is consistent to the data: passed; 6. The format is correct: passed
Method
WDCC-TQA checklist
Method Description
Checks performed by WDCC. The list of TQA metrics are documented in the 'WDCC User Guide for Data Publication' Chapter 8.1.1