QC Results are available at:
http://cera-www.dkrz.de/WDCC/CMIP5/QCResult.jsp?experiment=cmip5/output1/NCC/NorESM1-ME/esmControl
Status Explanation:
QCL2_started: QC Level 2 checks are ongoing.
QCL2_assigned: QC Level 2 is assigned to the experiment.
QCL3_started: QC Level 3 checks are ongoing.
QCL3_assigned: QC Level 3 is assigned to the experiment and the data is DOI published according to the DataCite regulations [
http://datacite.org/]. This data, its basic metadata and its DOI are persistent.
QCL1: The data of the experiment is withdrawn and waiting for a QC Level 2 check restart.
Last Change |
Revision of QC L2 |
Status |
Comment |
2012-12-13T14:20:12 |
2 |
QCL3_assigned |
QC Level set to QCL3_assigned (2012-12-13 14:20:12 UTC): doi:10.1594/WDCC/CMIP5.NCCNEec [http://dx.doi.org/10.1594/WDCC/CMIP5.NCCNEec ]; QC Level2 assigned at 2012-11-12 09:39:11 UTC: confirmed by Ingo Bethke for v20121107 |
2012-11-09T15:06:01 |
2 |
QCL2_started |
- |
2012-11-09T15:06:01 |
2 |
QCL2_assigned |
QC Level2 assigned at 2012-11-12 09:39:11 UTC: confirmed by Ingo Bethke for v20121107 |
2012-11-07T06:29:32 |
1 |
QCL2_started |
- |
Back to QC summary page...