QC Results are available at:
http://cera-www.dkrz.de/WDCC/CMIP5/QCResult.jsp?experiment=cmip5/output1/MIROC/MIROC5/decadal1970
Status Explanation:
QCL2_started: QC Level 2 checks are ongoing.
QCL2_assigned: QC Level 2 is assigned to the experiment.
QCL3_started: QC Level 3 checks are ongoing.
QCL3_assigned: QC Level 3 is assigned to the experiment and the data is DOI published according to the DataCite regulations [
http://datacite.org/]. This data, its basic metadata and its DOI are persistent.
QCL1: The data of the experiment is withdrawn and waiting for a QC Level 2 check restart.
Last Change |
Revision of QC L2 |
Status |
Comment |
2015-01-29T13:58:58 |
1 |
QCL3_assigned |
QC Level set to QCL3_assigned (2015-01-29 13:58:58 UTC): doi:10.1594/WDCC/CMIP5.MIM5DEC [http://dx.doi.org/10.1594/WDCC/CMIP5.MIM5DEC ]: Single DOI assigned to collection of all decadal experiments; QC Level2 assigned at 2012-05-16 05:50:56 UTC: QC L2 assignment confirmation from Koji Ogochi (16.05.2012) |
2012-02-03T02:26:56 |
1 |
QCL2_assigned |
QC Level2 assigned at 2012-05-16 05:50:56 UTC: QC L2 assignment confirmation from Koji Ogochi (16.05.2012) |
2012-02-03T02:26:56 |
1 |
QCL2_started |
- |
Back to QC summary page...