QC Results are available at:
http://cera-www.dkrz.de/WDCC/CMIP5/QCResult.jsp?experiment=cmip5/output1/IPSL/IPSL-CM5A-LR/midHolocene
Status Explanation:
QCL2_started: QC Level 2 checks are ongoing.
QCL2_assigned: QC Level 2 is assigned to the experiment.
QCL3_started: QC Level 3 checks are ongoing.
QCL3_assigned: QC Level 3 is assigned to the experiment and the data is DOI published according to the DataCite regulations [
http://datacite.org/]. This data, its basic metadata and its DOI are persistent.
QCL1: The data of the experiment is withdrawn and waiting for a QC Level 2 check restart.
Last Change |
Revision of QC L2 |
Status |
Comment |
2016-01-07T14:14:44 |
1 |
QCL3_assigned |
QC Level set to QCL3_assigned (2016-01-07 14:14:44 UTC): doi:10.1594/WDCC/CMIP5.IPILmh [http://dx.doi.org/10.1594/WDCC/CMIP5.IPILmh ] |
2013-10-11T17:30:57 |
1 |
QCL2_started |
- |
Back to QC summary page...