QC Results are available at:
http://cera-www.dkrz.de/WDCC/CMIP5/QCResult.jsp?experiment=cmip5/output1/IPSL/IPSL-CM5A-LR/decadal1970
Status Explanation:
QCL2_started: QC Level 2 checks are ongoing.
QCL2_assigned: QC Level 2 is assigned to the experiment.
QCL3_started: QC Level 3 checks are ongoing.
QCL3_assigned: QC Level 3 is assigned to the experiment and the data is DOI published according to the DataCite regulations [
http://datacite.org/]. This data, its basic metadata and its DOI are persistent.
QCL1: The data of the experiment is withdrawn and waiting for a QC Level 2 check restart.
Last Change |
Revision of QC L2 |
Status |
Comment |
2016-01-07T14:17:13 |
2 |
QCL3_assigned |
QC Level set to QCL3_assigned (2016-01-07 14:17:13 UTC): doi:10.1594/WDCC/CMIP5.IPIL70 [http://dx.doi.org/10.1594/WDCC/CMIP5.IPIL70 ]; QC Level2 assigned at 2013-10-02 09:40:36 UTC: 120 files not checked by QC software |
2013-09-25T10:30:13 |
2 |
QCL2_assigned |
QC Level2 assigned at 2013-10-02 09:40:36 UTC: 120 files not checked by QC software |
2013-09-25T10:30:13 |
2 |
QCL2_started |
- |
2012-09-22T17:02:54 |
1 |
QCL2_started |
- |
Back to QC summary page...