QC Results are available at:
http://cera-www.dkrz.de/WDCC/CMIP5/QCResult.jsp?experiment=cmip5/output1/FIO/FIO-ESM/piControl
Status Explanation:
QCL2_started: QC Level 2 checks are ongoing.
QCL2_assigned: QC Level 2 is assigned to the experiment.
QCL3_started: QC Level 3 checks are ongoing.
QCL3_assigned: QC Level 3 is assigned to the experiment and the data is DOI published according to the DataCite regulations [
http://datacite.org/]. This data, its basic metadata and its DOI are persistent.
QCL1: The data of the experiment is withdrawn and waiting for a QC Level 2 check restart.
Last Change |
Revision of QC L2 |
Status |
Comment |
2013-06-18T06:23:30 |
2 |
QCL3_assigned |
QC Level set to QCL3_assigned (2013-06-18 06:23:30 UTC): doi:10.1594/WDCC/CMIP5.FIFIpc [http://dx.doi.org/10.1594/WDCC/CMIP5.FIFIpc ]; QC Level2 assigned at 2013-05-14 06:01:40 UTC: No errors/warnings raised by QC level2 tool for v20120616 |
2013-05-13T09:30:20 |
2 |
QCL2_assigned |
QC Level2 assigned at 2013-05-14 06:01:40 UTC: No errors/warnings raised by QC level2 tool for v20120616 |
2013-05-13T09:30:20 |
2 |
QCL2_started |
- |
2013-04-26T05:47:10 |
1 |
QCL2_started |
- |
Back to QC summary page...